New in 1.2 Import from Strong or Hevy

Log a set in two taps. Never miss a rest.

A strength logger built for Apple Watch. Sets, rest and PRs all happen on your wrist, fully offline. Never pull out your phone.

10 free workouts every month · Unlimited with a one-time $4.99 unlock · No subscription

Detent on Apple Watch celebrating a new PR: Barbell Bench Press, estimated 1RM 215.8 lb, 185 lb heaviest
The Detent App Preview: start a routine on Apple Watch, log a set in two taps, celebrate a PR, rest, undo or add a set, check plates per side, then review the recap and progress on iPhone.
2
Taps per set
800+
Exercises, plus yours
10
Free workouts a month
0
Accounts, ads or subscriptions
On Apple Watch

Your whole workout,
on your wrist.

Start a routine and leave your phone in the bag. Every set is saved on the watch the moment you log it. No phone, no signal needed.

Apple Watch showing the routine Push Day A, 6 exercises, about 47 minutes, with a Start Workout button
01 · Start

Pick a routine. Start.

Your routines sync from iPhone. One tap starts the workout on your wrist.

Apple Watch logging set 2 of 4 of Barbell Bench Press at 185 lb for 5 reps, with a Log Set button
02 · Log

Two taps per set.

Dial weight and reps with the Digital Crown or +/−, then Log Set. Your last weight is already filled in.

Apple Watch rest timer at 1:53 with −30, Skip and +30 buttons; next set 45 + 25 lb per side
03 · Rest

Rest you can't miss.

The timer keeps running wrist-down, then taps your wrist harder each time until you acknowledge it. −30, +30 or Skip.

Apple Watch PR screen: Barbell Bench Press, estimated 1RM 215.8 lb, 185 lb heaviest
04 · PR

PRs, on the spot.

Beat a best and your wrist celebrates it the moment it happens, with your estimated 1RM.

Built for real sessions

Apple Watch workout controls: Undo Last Set, Skip Exercise and Add Set

Undo, skip, add.

Fix a mis-tap, skip an exercise or add a set without leaving the workout.

Apple Watch showing an estimated 1-rep max of 216 lb and 45 + 25 lb plates per side

Plates per side.

Weight steps follow the equipment: plates per side on a barbell, real steps for dumbbells, machines and cables. Plus your estimated 1RM.

Apple Watch offering to resume the unfinished workout Push Day A, or finish it

Crash-safe.

If the app crashes or is force-quit mid-workout, Detent offers to resume right where you were.

Offline. Phone in the bag.

Nothing needs a signal. A Smart Stack widget keeps the workout a glance away, and every session saves to Apple Health.

On iPhone

Plan it on iPhone.
Review every session.

Build routines and look back on the big screen. The phone never has to come to the gym.

Routines with supersets

Target reps and rest for every exercise. Your routines sync to the watch.

iPhone routine editor for Push Day A: sets, reps and rest per exercise, with a superset

A recap after every session

Total volume, new PRs and the muscle groups you trained.

iPhone workout recap: 10,270 lb total volume, 58 minutes, 19 sets and 3 PRs

Fix a set

Logged the wrong weight? Change any set afterwards, or delete a workout.

iPhone Edit Sets screen for Barbell Bench Press: a warm-up set and four sets of 185 lb for 5 reps

Progress charts

Your e1RM trend, weekly volume and a PR board for every lift.

iPhone progress charts: estimated 1RM trend at 215.8 lb and weekly total volume

800+ exercises, plus yours

Add your own with its muscle and equipment, and the watch uses the right weight steps.

iPhone New Exercise form for a custom exercise, Atlas Stone Load, with primary muscle and equipment choices

Now Training

While the watch workout runs, your iPhone mirrors it live, with a Live Activity.

iPhone mirroring a live watch workout: 24:06 elapsed, resting with 1:08 left, Incline Dumbbell Press up next
New in 1.2 · Switching

Bring your Strong
or Hevy history.

Export a CSV from Strong or Hevy and import it in Detent on your iPhone. Your training history comes with you.

  • Exercises are matched to Detent's library. Names it doesn't know become custom exercises, so nothing is lost.
  • Your last weights and PR baselines are ready on the watch, so you don't start from zero.
  • Imported workouts never count toward your 10 free workouts.
  • Leaving is just as easy: export everything to CSV, any time.
Download free and import
iPhone Import Workouts screen previewing a Strong export: it asks which unit you logged in Strong, shows the heaviest set as a check, then 390 workouts and 5,070 sets, 10 exercises matched to Detent's library and 3 kept as custom exercises
Private by design

No account.
Nothing collected.

Your training is yours. Detent doesn't know who you are, and doesn't need to.

No account

No sign-up, no email, no password. Open the app and start lifting.

Data Not Collected

That's Detent's App Store privacy label. No analytics, ads or trackers in the app.

Your own iCloud

Watch and iPhone sync through your private iCloud. We never see your workouts.

Apple Health

Every workout saves to Apple Health and counts toward your rings.

Read the privacy policy.

Pricing

Free every month.
Unlimited, once.

Every feature is in the free version. Unlimited lifts the monthly cap, that's it. No subscription, no ads, no paywall nags.

Detent Free

$0
10 workouts every calendar month
  • Every feature included
  • The count resets on the 1st
  • History, routines, charts, import and export are never locked
  • Imported workouts don't count

Detent Unlimited

$4.99once
One-time purchase · not a subscription
  • Unlimited workouts
  • Nothing auto-charged, no ads
  • Buy it on iPhone or right on your Apple Watch
  • Family Sharing on
  • Every future update included
Apple Watch after the monthly free workouts are used: Detent Unlimited removes the monthly limit, one payment, never a subscription
Used this month's 10? Unlock Unlimited right on your wrist.
Download free on the App Store

US price · may vary by region · not yet in EU storefronts

FAQ

Questions?
We've got you.

What's free, and what does Unlimited add?

Detent is free for 10 workouts every calendar month, with every feature included; the count resets on the 1st. Detent Unlimited is a one-time $4.99 purchase that removes the limit. Your history, routines, charts, import and export are never locked, and imported workouts don't count toward the 10.

Is it a subscription?

No. Detent Unlimited is a single one-time purchase: no subscription, no ads, nothing auto-charged. Family Sharing is on, and every future update is included.

Do I need an Apple Watch?

To log workouts, yes. Sets, rest timers and PRs happen on an Apple Watch running watchOS 11 or later. Without a watch, the iPhone app can still build routines, browse exercises and import your history, but it doesn't log workouts.

Do I need my iPhone at the gym?

No. Starting a workout, logging sets and rest timers all work on your Apple Watch, fully offline. The workout syncs to your iPhone later through your private iCloud.

How do I log a set?

On your watch, set weight and reps with the Digital Crown or the +/− buttons, then tap Log Set. Two taps. Your last weight is already filled in.

Can I import my workouts from Strong or Hevy?

Yes. Export a CSV from Strong or Hevy and import it in Detent on your iPhone. Exercises are matched to Detent's library, names it doesn't know become custom exercises, and imported workouts never count toward your 10 free workouts. You can export everything to CSV at any time.

Can I add my own exercises?

Yes. Detent comes with 800+ exercises, and you can add your own on iPhone with a primary muscle and equipment. The equipment sets the weight steps and plates on your watch.

Can I buy Unlimited on my watch?

Yes. You can buy Detent Unlimited on your iPhone or right on your Apple Watch.

What if the app crashes mid-workout?

If Detent crashes or is force-quit in the middle of a workout, it offers to resume right where you were the next time you open it.

Does my data sync? Is it private?

Yes. Your Apple Watch and iPhone sync through your own private iCloud. There's no account, and Detent's App Store privacy label is Data Not Collected. We never see your workouts.

What do I need?

An Apple Watch on watchOS 11 or later (Series 6 or newer, SE 2nd generation, or any Ultra), paired with an iPhone on iOS 18 or later.

Can I build my own routines?

Yes, in the Detent app on iPhone: supersets, target reps and rest for every exercise. Your routines sync to your watch.

Is Detent available in the EU?

Not yet. Detent isn't available in EU App Store storefronts yet — we're completing the EU Digital Services Act registration. It's available in the US, the UK, Türkiye, Canada, Australia, Switzerland, Norway, Japan and many other countries. Email us and we'll let you know when it reaches the EU.

Still stuck? Email ahmetenesdur@gmail.com — we usually reply within a day.

Leave the phone
in the bag.

Your next set is two taps away.

10 free workouts every month · Unlimited with a one-time $4.99 unlock · No subscription